Project Milestones

A chronological record of how Jaimepatisser moved from prototype testing to full-scale installations across Malaysia's food processing sector.

2016 - First 500kg Mixer Prototype

Completed the first automated dough mixer rated for 500kg batches. Ran 14 months of continuous trials at a partner plant in Selangor before opening orders.

2018 - Conveyor Oven Line Launched

Introduced the heavy-duty conveyor oven series with modular heat zones. First three units installed at a frozen dough facility in Johor, cutting bake time by 22%.

2020 - Food-Grade Steel Certification

All contact surfaces upgraded to 316L stainless steel. Passed third-party hygiene audits for direct food contact across the full equipment range.

2022 - Automated Control System Update

Rolled out a new PLC-based control interface with recipe storage and remote diagnostics. Existing clients received the upgrade as a standard service visit.

2024 - Regional Service Network

Established service hubs in Penang, Selangor, and Johor. Response time for spare parts and on-site maintenance now averages under 48 hours.

2025 - Current Production Capacity

Factory in Selayang now ships four complete production lines per quarter. All units are assembled, tested, and documented before leaving the floor.

From inquiry to installed line

We work in five clear stages so your plant team knows what happens next, who handles it, and how long each step usually takes.

Step 01

Requirement review

Send us your batch sizes, line speed, and floor layout. We check capacity against our mixer and oven ranges before anything else.

Step 02

Site assessment

Our engineers visit your plant to measure power supply, ventilation, and loading bays. This decides what fits without rework.

Step 03

Equipment proposal

You receive a written spec with model numbers, output figures, and installation drawings. No vague quotes, only concrete parameters.

Step 04

Fabrication and testing

Units are built at our Selangor workshop and run through a full load test. You get test reports before shipment is scheduled.

Step 05

Installation and handover

Our crew installs the line, trains your operators, and stays until the first production batch meets your target output.

What you gain before the first batch runs

Getting started with Jaimepatisser means working through a defined sequence: site survey, line integration review, commissioning, and operator training. Each step has a clear output, so you know what happens next and what your team needs to prepare.

Line integration mapped to your floor plan

We measure your existing conveyor layout, power supply, and ceiling clearance before quoting. The result is a documented integration plan that shows where each mixer and oven sits, so installation day has no surprises.

Commissioning with a fixed checklist

Every machine runs through a 40-point checklist covering belt tension, thermal calibration, and safety interlocks. You receive the signed report before production starts, not after.

Operator training on your actual recipe

We train your line staff using your own dough formulation and bake times, not a generic demo batch. This shortens the gap between handover and consistent output.

Spare parts list tied to your serial numbers

Each unit ships with a parts catalog matched to its serial number. Reordering wear items like belts and thermocouples takes one email instead of a full machine teardown.

Remote diagnostics from day one

Our control systems log operating data that our engineers can review remotely. If a fault appears, we can often identify the cause before dispatching a technician, reducing downtime.

Documentation in plain language

Manuals cover routine cleaning, weekly lubrication, and fault codes without jargon. Your maintenance crew can handle most issues without calling us, which keeps your line moving.

Cookie settings

We use cookies to keep the site reliable, remember basic choices, and understand which pages are useful. You can accept, reject, or review the settings before continuing.